-Elite Property Group
-Dandenong
- Excavation process for strips and pad footings
- Installations of Services
- adjusting roof sheeting which would also include capping's and flashings
- Hold down bolts connected to footing and steel column
- moving into place the Universal Steel Beam
- already with cleats, apex and knee joint plate connected
- With the main steel portal frame placed
- The pre-cast concrete panels are transported into the correct placement
- Spider webbing is used to hold up the concrete panels
- while the correct use of connection is made between the steel members and the panel
- contractors make extra connection for example cleats to the universal column for girts
- Picture of the entire construction of purlins bracing the portal frame and concrete panels
- not including safety mesh, insulation and roof sheeting and the concrete slab
- elevation of the portal frame and the purlins and including the bracing and other connection members
- dumping compacted sand before
- the placing of the concrete slab
No comments:
Post a Comment